Generations Energy

Generations Solar

Sign in on GenHQ to open Sales.

Go to GenHQ
Generations Energy Sales ← Back to GenHQ


Coming soonFeasibility reports aren't available yet.
Generations

How much you could save or make with Generations Solar

Let’s find out together

Create report

Occupier & property

Drag the pin so it sits exactly on the building.

Drag & drop the supplier's quote PDF here, or

Daylight/night are optional — leave blank if their quote doesn't break usage down this way. Both need a value for the split to be used.

Panels
Inverter
Battery
Electrical components
Subcontractor install

Energy Monitoring System pricing

The metering/control hardware that lets you bill for the power resold — a one-off install cost of $2,500 for systems up to 100 kW, or $5,000 above that, added to the total. It also carries a $90/month ongoing fee, billed separately.

Who's this for?

Buildings

Most properties are one building. For a property with several separately-metered buildings (e.g. two sheds on a farm), add one block per building — each gets its own roof, usage data and bill.

Reports | Quotes

Previously generated system specs. Click one to view it again.

Sales Reports / Activity

Every new lead and every opportunity that moved, flowing in automatically from Go High Level (which pulls from SalesRabbit).

Loading…

What did you do?

Tick a task when it's done: what you did is saved as a note in Go High Level and SalesRabbit. Overdue first, then by what's closest to a sale (New leads, Proposals sent, Design & quoting, Feasibility, Awaiting info), then longest waiting. "Due" uses each stage's own timing, the same rule as the Sales Dashboard TV's colours.

Date range
 
to
Source

New leads — by month

Last 6 months · click a tile above to change what's charted

Leads & opportunities

– rows
Name Business name Area
Appointment Quoted Quote value
Last updated
Checking Go High Level…
Under 7 days in stage7–14 daysStuck 14+

Loading…

Pick someone on the left.

Log

Pricing calibration

Calculate system prices parts from the Equipment catalog, then adds allowances for everything the catalog can't price (labour, cabling, switchgear, access, freight, engineering, project management, contingency). Enter what completed jobs actually cost and this page shows how far those allowances are off, and fits better ones.

Equipment catalog

Every product, SKU and price the quotes use, kept up to date from Cin7.

Board report

Open opportunities in Go High Level